From leaky toilet, rotten floor and 9x9 asbestos floor tiles to George Pasific Drymax 3/4" Subfloor glued, vinyl plank flooring and new toilet.
Before
Before
After
After
Bathroom Completion and Barn Door Install
Customer had a bathroom that the previous owner had started to create and didn't finish for whatever reason. The shower didn't allow for a normal door so removed and installed a barn door. Shower was started but out of order so had to all be redone.
After
After
After
Bathroom Remodel
Moved the entry from the bedroom into the hall after relocating the thermostat and the electric plug, removed the hall closet to enlarge the bathroom, removed the little 1/2 bench thing behind the toilet and relocated the toilet, replaced most of the drywall, releveled the floor, and installed new flooring, trimmed and painted.
Before
Before
After
After
After
Bathroom Remodel (Tile)
Replaced and Relocated the Exhaust vent and added a second light, New Drywall ceiling finished, refinished the walls and painted, New Tile Shower, New Tile floor, New Glass Shower Doors, New Toilet, New Vanity and light
Before
Before
After
After
Deck Replacement
Replaced a 22x16 unsafe deck with 10x10 composite deck with horizontal cable spindles. Cleared out the overgrowth, Graded and spread Mulch. Siding is ordered to replace the wall that has the deck attached. Replaced the entry door from house to garage, replaced front entry storm door, fixed a couple of interior doors.
Before
Before
After
After
After
After
Roof Replacement
Tree damage...fixed 4 trusses, replaced a deck board, new roof and gutter.